# Licença de construção

The licença de construção is the municipal decision authorising construction, extension or alteration works that require a licence. Since the urban planning Simplex, the works no longer get a permit document and are covered by the receipt for the fees paid.

Not every project needs a licence: the RJUE distinguishes licensing, prior notification and works exempt from prior control. Decree-Law 10/2024 widened prior notification and exemptions, and licensing can no longer be chosen where the law provides for prior notification.

The application is filed with the municipality with the architecture project and then the engineering projects. The decision has legal deadlines that depend on the size of the works, and the regime was amended again by Decree-Law 108/2026, so check the current procedure with the municipality.

Before buying land or a home to renovate, check in the [PDM](https://prazu.pt/en/glossary/pdm.md) what is allowed and, if needed, file a prior information request. When buying a property under construction, the CPCV should identify the title for the works.

Legal reference: Legal Regime for Urban Development and Building (Decree-Law 555/99), article 4

## FAQ

### Which works need a building licence?

Those the RJUE makes subject to licensing, such as many new buildings outside areas with a detailed plan or allotment permit. Others only require prior notification or are exempt, such as many interior works; the municipality confirms which regime applies.

### Is there still a building permit document (alvará)?

No. Since Decree-Law 10/2024, the licence is evidenced by the receipt for the fees due, which is a condition for it to take effect. In a purchase, ask for that receipt and the approved project.

## Sources

- [Urban Development and Building Regime (Diário da República)](https://diariodarepublica.pt/dr/legislacao-consolidada/decreto-lei/1999-34567875)

## Process templates

- [Land](https://prazu.pt/en/processes/land-purchase.md): Buying rural land or a building plot in Portugal: the stages, the seller's documents, zoning checks, IMT, the deed and land registration.
- [Commercial Property](https://prazu.pt/en/processes/commercial-property.md): Buying a shop, office or warehouse in Portugal: the stages, due diligence, the buying company's documents, 6.5% IMT, the deed and registration.
- [Purchase and Sale](https://prazu.pt/en/processes/property-purchase.md): The stages of a property purchase in Portugal, from the CPCV and deposit to IMT, the deed and registration, with the documents for each stage.

## Terms

- [PDM](https://prazu.pt/en/glossary/pdm.md): The PDM classifies each municipality's land as urban or rural and sets what may be built. Why to check it before buying land in Portugal.
- [Licença de utilização](https://prazu.pt/en/glossary/licenca-de-utilizacao.md): The use licence (now autorização de utilização) confirms what a building may be used for. Since 2024 it is not required at the deed, but it still matters.
- [Ficha técnica de habitação](https://prazu.pt/en/glossary/ficha-tecnica-de-habitacao.md): The housing technical sheet describes a home's construction and fittings. It is no longer required at the deed but still exists and can be requested.
- [BUPi](https://prazu.pt/en/glossary/bupi.md): BUPi is the Portuguese service where owners map rural and mixed plots and regularise their registration. What it does and what changed in 2026.

Last updated: 2026-10-12

Canonical: https://prazu.pt/en/glossary/licenca-de-construcao/